Kitchen renovation in Laval
From a cabinet and counter refresh to a full open-concept kitchen, we design, build and finish Laval kitchens with one team and one fixed price.

How we run a Laval kitchen project
We start at your home: measurements, photos and what is not working in the current kitchen. You then get a layout and material plan, a fixed-price quote and a dated schedule. Demolition, plumbing and electrical work, cabinets, counters, backsplash, lighting and paint are all handled by our team, with one person you can call from start to finish.
In many Laval bungalows and split-levels, the biggest gain comes from opening the wall between the kitchen and the living room. Whether that wall is load-bearing changes the plan, so we check it before we price anything.
Permits for a kitchen in Laval
According to the City of Laval, renovating an existing kitchen does not require a permit. A permit is required when the work changes room dimensions, the number of rooms or the structure of the house, which is usually the case when a wall comes down. Changing electrical wiring inside walls or ceilings also needs a permit.
When a permit is needed, the fee is $92 for the first $20,000 of work, plus $2.50 per additional $1,000, with about 30 days of processing once the file is complete. We prepare the plans and file it for you.
What a kitchen costs
As a rough Montreal-area market range, a mid-range kitchen renovation runs about $25,000 to $60,000 before taxes, and more for high-end custom work. Cabinet type, counter material and whether plumbing moves make the biggest difference. Your real price is fixed after the visit. In Laval there is a visit fee based on your exact location, confirmed when you book. The site visit is free in the West Island.
What's included
- Layout planning and drawings
- Demolition and site protection
- Cabinet supply and installation
- Quartz, granite or laminate counters and backsplash
- Plumbing, electrical and lighting coordinated with licensed trades
- Flooring, paint and final finishing
Official sources
Laval neighbourhoods we cover
Your project in 60 seconds
Four quick questions. We call you back within one business day to book an on-site consultation (free in the West Island).
- Takes about 60 seconds
- A real person calls you back within one business day
- No obligation, no pressure
Your project qualifies for an on-site consultation.
Questions
Do I need a permit to renovate my kitchen in Laval?
Not to renovate an existing kitchen, according to the City of Laval. You need one if walls move, the structure changes or electrical wiring inside walls is modified. We check your plan and file the permit if needed.
Can you remove the wall between my kitchen and living room?
Usually yes. We first check whether the wall is load-bearing; if it is, a beam is designed and installed, which needs a permit in Laval.
How long does a kitchen renovation take?
Most kitchens take about 3 to 6 weeks of work on site, depending on cabinet lead times. The dated schedule comes with the quote.
Do you serve all of Laval?
Yes, every neighbourhood: Chomedey, Sainte-Rose, Fabreville, Vimont, Duvernay, Auteuil, Sainte-Dorothée, Laval-des-Rapides, Pont-Viau and the rest.