Home additions in Laval

A second storey, a rear extension, an attached garage or a four-season solarium: we plan, permit and build home additions in Laval as one team.

Basement framing and insulation in progress

Additions that fit Laval houses

A Laval bungalow on a good lot is one of the best candidates for an addition: going up with a second storey or out with a rear extension usually costs less than moving, and you keep your neighbourhood. We look at the foundation, the structure, the lot setbacks and the zoning before we draw anything, so the plan is buildable from day one.

Permits for an addition in Laval

According to the City of Laval, a permit is mandatory before enlarging a single-family house. The city lists examples such as adding a second storey, a garage built into the house, a permanent carport attached to the house, and a solarium or veranda attached to the house.

The fee is $92 for the first $20,000 of work, plus $2.50 per additional $1,000. For an $80,000 addition that is about $242, plus connection fees if new water or sewer connections are needed. Laval gives about 50 days of processing once the file is complete, more if the property is under a PIIA or needs a minor variance. The steps are: check whether a PIIA applies, prepare the file, submit and pay, the city analyses it, you receive the permit by email, then an inspector visits.

The Service de l'urbanisme, 1333, boulevard Chomedey, Laval offers appointments in person or by video before you apply. We prepare the plans and documents and handle the file with you.

Timeline and cost

Every addition is different, so we price it after the visit and the first plans, with a fixed price and a dated schedule. Plan for the permit delay above before construction can start, which is why many homeowners start the design in fall or winter to build in spring. In Laval there is a visit fee based on your exact location, confirmed when you book. The site visit is free in the West Island.

What's included

  • Plans and coordination with your architect or engineer
  • Permit applications with the city
  • Foundation, framing and roofing
  • Windows, insulation and building envelope
  • Plumbing, electrical and HVAC with licensed trades
  • Interior finishing to move-in ready

Official sources

Laval neighbourhoods we cover

AuteuilChomedeyDuvernayFabrevilleÎles-LavalLaval-des-RapidesLaval-OuestLaval-sur-le-LacPont-ViauSainte-DorothéeSainte-RoseSaint-FrançoisSaint-Vincent-de-PaulVimont

Our work

Real job sites, photographed by our team.

Project check

Your project in 60 seconds

Four quick questions. We call you back within one business day to book an on-site consultation (free in the West Island).

  • Takes about 60 seconds
  • A real person calls you back within one business day
  • No obligation, no pressure
ProjectScopeTimingBudgetContact

What are you renovating?

How big is the job?

When would you like to start?

Rough budget

Where should we reach you?

Photos of the space (optional)
Up to 5 photos. They help us prepare the visit.

Your project qualifies for an on-site consultation.

Questions

Do I need a permit for a home addition in Laval?

Yes, always. The City of Laval requires a permit before enlarging a single-family house, including a second storey, an attached garage or a solarium.

How long does the Laval permit take for an addition?

The city indicates about 50 days once the file is complete, more if a PIIA or a minor variance applies.

How much is the permit fee?

$92 for the first $20,000 of work plus $2.50 per additional $1,000, so about $242 for an $80,000 addition, plus connection fees if needed.

Do you prepare the plans?

Yes. We coordinate the plans and the structural design with qualified professionals and file the permit with you.

CallWhatsAppQuote