Bathroom
Full remodel: about $15,000 to $35,000. Refresh of finishes (vanity, fixtures, tile surround): about $8,000 to $15,000. What moves the price: moving the toilet or shower drain, the amount of tile and its format, custom glass, heated floors and niches.
Kitchen
Mid-range renovation: about $25,000 to $60,000, more for high-end custom work. What moves the price: stock, semi-custom or custom cabinets, the counter material, moving plumbing, gas or electrical, removing a wall, appliances and lighting.
Basement
Finishing: about $40 to $90 per square foot. What moves the price: adding a bathroom, an egress window or a kitchenette, existing moisture or ceiling height issues, flooring and ceiling choices.
Decks
Wood deck: about $40 to $70 per square foot. Composite deck: about $60 to $100 per square foot. What moves the price: height and number of stairs, railing (aluminum, glass, wood), a pergola and site access.
Taxes, permits and how to read a quote
All ranges above are before taxes, and in Quebec renovation work is taxed at GST 5% plus QST 9.975%, 14.975% in total. Permit fees are small compared to the job: in Laval, $92 for the first $20,000 plus $2.50 per additional $1,000; in Montreal boroughs, $9.80 per $1,000 of estimated work.
A good quote is a fixed price with a written scope, the materials named, a dated schedule and payments staged by milestone. Be wary of a very low number with a vague scope: that is where extras appear halfway through.
How we price
We visit, measure and then send a fixed price with a dated schedule. The visit is free in the West Island; elsewhere in Montreal and Laval there is a visit fee based on your location, confirmed when you book.
Planning this project?
Tell us about it in 60 seconds or call 514-241-4530. We visit, measure and send a fixed price with a dated schedule. The visit is free in the West Island; elsewhere a visit fee applies based on your location.
